{"id":338,"date":"2013-02-02T23:25:51","date_gmt":"2013-02-03T05:25:51","guid":{"rendered":"http:\/\/www.1515r.org\/?p=338"},"modified":"2013-02-12T23:44:48","modified_gmt":"2013-02-13T05:44:48","slug":"phase-ii-week-7","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=338","title":{"rendered":"Phase II &#8211; Week 7"},"content":{"rendered":"<p>The arrival of large gas heaters on first floor signals the progress for week seven. \u00a0The heaters are needed for the Gyp-crete pour needed on second and third floor of the old wing to bring the floors up to level:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-001.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-339\" alt=\"Construction 2013-02-02 001\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-001-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-001-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-001-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Demolition is almost finished on second floor, with the layout looking much more open these days:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-005.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-340\" alt=\"Construction 2013-02-02 005\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-005-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-005-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-005-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-006.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-341\" alt=\"Construction 2013-02-02 006\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-006-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-006-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-006-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-012.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-342\" alt=\"Construction 2013-02-02 012\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-012-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-012-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-012-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Brothers Tom Salistean \u201906 and \u00a0Kenton M. Moore \u201906 take one last shower on second floor:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-007.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-343\" alt=\"Construction 2013-02-02 007\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-007-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-007-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-007-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>On third floor, demolition is complete, which included erection of a temporary supporting wall once the hallway walls were removed. \u00a0The only walls remaining will stay in the new layout. \u00a0As mentioned, Gyp-crete was poured to bring the differing floor heights all up to the same level, and is currently curing with the help of the heaters:<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-021.jpg\"><img loading=\"lazy\" class=\"aligncenter\" alt=\"Construction 2013-02-02 021\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-021-300x225.jpg\" width=\"300\" height=\"225\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-022.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-344\" alt=\"Construction 2013-02-02 022\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-022-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-022-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-022-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-023.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-345\" alt=\"Construction 2013-02-02 023\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-023-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-023-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-023-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-024.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-346\" alt=\"Construction 2013-02-02 024\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-024-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-024-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-024-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-025.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-347\" alt=\"Construction 2013-02-02 025\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-025-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-025-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/02\/Construction-2013-02-02-025-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The arrival of large gas heaters on first floor signals the progress for week seven. \u00a0The heaters are needed for the Gyp-crete pour needed on second and third floor of the old wing to bring the floors up to level: &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=338\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 7<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":339,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/338"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=338"}],"version-history":[{"count":7,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/338\/revisions"}],"predecessor-version":[{"id":356,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/338\/revisions\/356"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/339"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}