{"id":596,"date":"2013-03-09T17:38:49","date_gmt":"2013-03-09T23:38:49","guid":{"rendered":"http:\/\/www.1515r.org\/?p=596"},"modified":"2013-03-09T17:38:49","modified_gmt":"2013-03-09T23:38:49","slug":"phase-ii-week-12","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=596","title":{"rendered":"Phase II &#8211; Week 12"},"content":{"rendered":"<p>Week 12 brings a bit of rain, but also more progress.  Outside, demolition has begun on the existing basketball court and retaining wall:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-004.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-004-300x225.jpg\" alt=\"Construction 2013-03-09 004\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-597\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-004-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-004-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The fire escape will be rotating and moving over to meet up with the new exit locations.  The new footings are starting to be prepped and the new door frames are in also:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-006.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-006-300x225.jpg\" alt=\"Construction 2013-03-09 006\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-598\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-006-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-006-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-009.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-009-300x225.jpg\" alt=\"Construction 2013-03-09 009\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-599\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-009-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-009-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>In the basement, part of the floor has been removed to smooth the transition out, and the new steel for the chapter room opening is being prepped:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-026.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-026-225x300.jpg\" alt=\"Construction 2013-03-09 026\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-600\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-026-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-026-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-034.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-034-300x225.jpg\" alt=\"Construction 2013-03-09 034\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-601\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-034-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-034-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Upstairs, the plumbers have moved onto the second floor bathroom:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-046.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-046-300x225.jpg\" alt=\"Construction 2013-03-09 046\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-602\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-046-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-046-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-044.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-044-300x225.jpg\" alt=\"Construction 2013-03-09 044\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-603\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-044-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-044-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>In the pledge wing, the partition walls to split the rooms into sleeping\/living spaces are being installed:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-051.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-051-300x225.jpg\" alt=\"Construction 2013-03-09 051\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-604\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-051-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-051-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Finally, up on third floor the arrival of drywall means as soon as the fire sprinklers are roughed-in, the ceilings and walls will start taking shape:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-062.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-062-300x225.jpg\" alt=\"Construction 2013-03-09 062\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-605\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-062-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-062-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-065.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-065-300x225.jpg\" alt=\"Construction 2013-03-09 065\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-606\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-065-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-09-065-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Week 12 brings a bit of rain, but also more progress. Outside, demolition has begun on the existing basketball court and retaining wall: The fire escape will be rotating and moving over to meet up with the new exit locations. &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=596\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 12<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1201,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/596"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=596"}],"version-history":[{"count":1,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/596\/revisions"}],"predecessor-version":[{"id":607,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/596\/revisions\/607"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1201"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}