{"id":657,"date":"2013-03-23T12:41:49","date_gmt":"2013-03-23T18:41:49","guid":{"rendered":"http:\/\/www.1515r.org\/?p=657"},"modified":"2013-03-24T12:42:17","modified_gmt":"2013-03-24T18:42:17","slug":"phase-ii-week-14","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=657","title":{"rendered":"Phase II &#8211; Week 14"},"content":{"rendered":"<p>Week 14 begins with progress in the basketball court.  The new retaining walls have been formed up and are ready to be poured:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-013.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-013-300x225.jpg\" alt=\"Construction 2013-03-23 013\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-658\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-013-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-013-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Inside, the masons have been busy patching openings and eliminating below-grade windows:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-022.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-022-225x300.jpg\" alt=\"Construction 2013-03-23 022\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-660\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-022-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-022-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-094.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-094-225x300.jpg\" alt=\"Construction 2013-03-23 094\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-661\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-094-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-094-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>Upstairs, two things are holding up installation of the drywall.  The first is installation of the fire sprinkler piping, which is progressing mainly on second floor right now:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-055.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-055-225x300.jpg\" alt=\"Construction 2013-03-23 055\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-662\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-055-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-055-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-065.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-065-300x225.jpg\" alt=\"Construction 2013-03-23 065\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-663\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-065-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-065-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The second is installation of the communications cabling, which has just begun:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-056.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-056-225x300.jpg\" alt=\"Construction 2013-03-23 056\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-664\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-056-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-056-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-057.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-057-300x225.jpg\" alt=\"Construction 2013-03-23 057\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-665\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-057-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-057-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Finally, the water piping installed so far is being pressure-tested to ensure there are no leaks before drywalling begins.  Let&#8217;s hope that 125 psi remains come Monday morning!<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-063.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-063-300x225.jpg\" alt=\"Construction 2013-03-23 063\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-666\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-063-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-23-063-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Week 14 begins with progress in the basketball court. The new retaining walls have been formed up and are ready to be poured: Inside, the masons have been busy patching openings and eliminating below-grade windows: Upstairs, two things are holding &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=657\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 14<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1203,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/657"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=657"}],"version-history":[{"count":2,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/657\/revisions"}],"predecessor-version":[{"id":668,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/657\/revisions\/668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1203"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}