{"id":690,"date":"2013-03-31T20:09:13","date_gmt":"2013-04-01T02:09:13","guid":{"rendered":"http:\/\/www.1515r.org\/?p=690"},"modified":"2013-04-01T20:18:12","modified_gmt":"2013-04-02T02:18:12","slug":"phase-ii-week-15","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=690","title":{"rendered":"Phase II &#8211; Week 15"},"content":{"rendered":"<p>Week 15 brings big changes in the basement. In the old portion of the house, ductwork and framing are starting to define the spaces:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-061.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-691\" alt=\"Construction 2013-03-331 061\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-061-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-061-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-061-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-063.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-692\" alt=\"Construction 2013-03-331 063\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-063-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-063-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-063-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>In the newly excavated crawl space, the walls are up, showing how large these 4-man suites will be:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-069.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-694\" alt=\"Construction 2013-03-331 069\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-069-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-069-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-03-331-069-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Additionally, new structural steel to support the turnaround in the chapter room has been installed:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-073.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-696\" alt=\"Construction 2013-03-331 073\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-073-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-073-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-073-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Throughout the house, fire sprinkler heads are continuing to pop up. In the main floor spaces, the sprinklers are being carefully fitted from above so as not to disturb the historic finishes:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-016.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-698\" alt=\"Construction 2013-03-331 016\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-016-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-016-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-016-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-027.jpg\"><img loading=\"lazy\" class=\"aligncenter size-medium wp-image-699\" alt=\"Construction 2013-03-331 027\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-027-300x225.jpg\" width=\"300\" height=\"225\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-027-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-027-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The insulation crew has also been busy, as all of the exterior walls have been spray-foamed for an air-tight and energy-efficient seal:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-030.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-030-300x225.jpg\" alt=\"Construction 2013-03-331 030\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-700\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-030-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-030-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-051.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-051-300x225.jpg\" alt=\"Construction 2013-03-331 051\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-701\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-051-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-051-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>One inspection down means we&#8217;re that much closer to starting drywall work and beginning the finishes:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-045.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-045-300x225.jpg\" alt=\"Construction 2013-03-331 045\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-702\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-045-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/03\/Construction-2013-03-331-045-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Week 15 brings big changes in the basement. In the old portion of the house, ductwork and framing are starting to define the spaces: In the newly excavated crawl space, the walls are up, showing how large these 4-man suites &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=690\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 15<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":691,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/690"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=690"}],"version-history":[{"count":4,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/690\/revisions"}],"predecessor-version":[{"id":704,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/690\/revisions\/704"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/691"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}