{"id":724,"date":"2013-04-14T19:40:15","date_gmt":"2013-04-15T01:40:15","guid":{"rendered":"http:\/\/www.1515r.org\/?p=724"},"modified":"2013-04-15T19:48:50","modified_gmt":"2013-04-16T01:48:50","slug":"phase-ii-week-17","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=724","title":{"rendered":"Phase II &#8211; Week 17"},"content":{"rendered":"<p>Week 17 may have brought some rough weather here in Lincoln, but that hasn&#8217;t slowed the masons down at all.  They&#8217;re just about finished filling in the brickwork, and after a bit of weathering it&#8217;ll be hard to spot their work (which of course is the idea):<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-005.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-005-300x225.jpg\" alt=\"Construction 2013-04-14 005\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-725\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-005-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-005-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Up on third floor, the drywall is all up and the taping crew should be starting soon:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-045.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-045-225x300.jpg\" alt=\"Construction 2013-04-14 045\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-726\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-045-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-045-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>On second floor, insulating and drywalling is continuing:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-025.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-025-300x225.jpg\" alt=\"Construction 2013-04-14 025\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-728\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-025-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-025-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-036.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-036-300x225.jpg\" alt=\"Construction 2013-04-14 036\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-729\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-036-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-036-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Down on first floor, finish carpentry has begun on some of the new windows to make them blend in seamlessly with the beautiful old woodwork:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-056.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-056-300x225.jpg\" alt=\"Construction 2013-04-14 056\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-730\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-056-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-056-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Down in the basement the plumbing is all in for the new bathroom, and the sand base means we should be seeing a new concrete floor soon:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-072.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-072-300x225.jpg\" alt=\"Construction 2013-04-14 072\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-732\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-072-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-072-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-086.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-086-300x225.jpg\" alt=\"Construction 2013-04-14 086\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-733\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-086-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-14-086-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Week 17 may have brought some rough weather here in Lincoln, but that hasn&#8217;t slowed the masons down at all. They&#8217;re just about finished filling in the brickwork, and after a bit of weathering it&#8217;ll be hard to spot their &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=724\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 17<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1205,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/724"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=724"}],"version-history":[{"count":3,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/724\/revisions"}],"predecessor-version":[{"id":734,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/724\/revisions\/734"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1205"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=724"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=724"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}