{"id":737,"date":"2013-04-20T18:40:40","date_gmt":"2013-04-21T00:40:40","guid":{"rendered":"http:\/\/www.1515r.org\/?p=737"},"modified":"2013-04-20T18:40:40","modified_gmt":"2013-04-21T00:40:40","slug":"phase-ii-week-18","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=737","title":{"rendered":"Phase II &#8211; Week 18"},"content":{"rendered":"<p>It&#8217;s hard to believe we&#8217;re already on week 18 of the renovation on our historic chapter house.  Up on third floor, drywall finishing has begun with the first coat of joint compound:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-009.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-009-225x300.jpg\" alt=\"Construction 2013-04-20 009\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-738\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-009-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-009-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>The electricians have also started pulling wire into the conduit installed during the rough-in phase:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-014.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-014-300x225.jpg\" alt=\"Construction 2013-04-20 014\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-739\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-014-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-014-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>In the bathrooms, the shower curbs are being formed up, which should be the last major obstacle before tile can begin:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-015.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-015-300x225.jpg\" alt=\"Construction 2013-04-20 015\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-741\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-015-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-015-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>On second floor, the pocket for the new Won-Door has been framed up.  This special fire door will allow us to keep the second floor landing open but still seal the staircase off in case of fire:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-019.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-019-300x225.jpg\" alt=\"Construction 2013-04-20 019\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-743\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-019-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-019-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>In the pledge wing, drywall installation is progressing:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-022.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-022-300x225.jpg\" alt=\"Construction 2013-04-20 022\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-745\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-022-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-022-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Another nice change is the east stairwell, where we were able to remove an unnecessary fire door and partition, opening a previously cramped stairwell up:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-028.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-028-225x300.jpg\" alt=\"Construction 2013-04-20 028\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-749\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-028-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-028-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>In the basement, new concrete steps have been poured to connect the rear staircase with the new hallway, and the floor of the bathroom has been poured:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-029.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-029-300x225.jpg\" alt=\"Construction 2013-04-20 029\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-750\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-029-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-029-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-036.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-036-300x225.jpg\" alt=\"Construction 2013-04-20 036\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-752\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-036-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-036-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><br \/>\n<a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-038.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-038-300x225.jpg\" alt=\"Construction 2013-04-20 038\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-751\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-038-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-038-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Outside, the forms are in place to begin pouring the new retaining wall around the basketball court:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-045.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-045-300x225.jpg\" alt=\"Construction 2013-04-20 045\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-753\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-045-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-045-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-046.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-046-300x225.jpg\" alt=\"Construction 2013-04-20 046\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-754\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-046-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/Construction-2013-04-20-046-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It&#8217;s hard to believe we&#8217;re already on week 18 of the renovation on our historic chapter house. Up on third floor, drywall finishing has begun with the first coat of joint compound: The electricians have also started pulling wire into &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=737\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 18<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1206,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/737"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=737"}],"version-history":[{"count":6,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/737\/revisions"}],"predecessor-version":[{"id":755,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/737\/revisions\/755"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1206"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}