{"id":758,"date":"2013-04-27T22:18:41","date_gmt":"2013-04-28T04:18:41","guid":{"rendered":"http:\/\/www.1515r.org\/?p=758"},"modified":"2013-04-29T22:28:59","modified_gmt":"2013-04-30T04:28:59","slug":"phase-ii-week-19","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=758","title":{"rendered":"Phase II &#8211; Week 19"},"content":{"rendered":"<p>The week 19 update starts off on the main level, where the wood floors in the living room have been patched.  We aren&#8217;t refinishing all of the original wood floors, but specific high-traffic areas are being patched and brought back to life:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-014.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-014-225x300.jpg\" alt=\"2013-04-27 Construction 014\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-759\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-014-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-014-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>Up on third floor, the first of the floor tile is being laid in the restroom:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-046.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-046-225x300.jpg\" alt=\"2013-04-27 Construction 046\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-760\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-046-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-046-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-045.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-045-300x225.jpg\" alt=\"2013-04-27 Construction 045\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-761\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-045-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-045-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The electricians are also busy pulling wire.  From the looks of those junction boxes, good luck figuring that out:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-047.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-047-300x225.jpg\" alt=\"2013-04-27 Construction 047\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-762\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-047-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-047-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The fire sprinkler system is being piped into the water supply, which means the water and gas meters are also being replaced to reconfigure this mechanical room:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-066.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-066-225x300.jpg\" alt=\"2013-04-27 Construction 066\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-763\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-066-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-066-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>I found the gas meter just hanging out in the basement hallway, and the water meter lazing around in the dining room:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-064.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-064-225x300.jpg\" alt=\"2013-04-27 Construction 064\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-764\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-064-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-064-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>Up on the roof, we&#8217;re getting close to being able to start mounting equipment, including all the new air conditioner condensers and the rooftop air handlers for the kitchen:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-040.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-040-300x225.jpg\" alt=\"2013-04-27 Construction 040\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-765\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-040-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-040-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Finally, down in the basement the final concrete has been formed and poured for the new basement bathroom:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-071.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-071-300x225.jpg\" alt=\"2013-04-27 Construction 071\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-766\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-071-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/04\/2013-04-27-Construction-071-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The week 19 update starts off on the main level, where the wood floors in the living room have been patched. We aren&#8217;t refinishing all of the original wood floors, but specific high-traffic areas are being patched and brought back &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=758\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 19<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1207,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/758"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=758"}],"version-history":[{"count":2,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/758\/revisions"}],"predecessor-version":[{"id":768,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/758\/revisions\/768"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1207"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}