{"id":826,"date":"2013-05-18T21:55:53","date_gmt":"2013-05-19T03:55:53","guid":{"rendered":"http:\/\/www.1515r.org\/?p=826"},"modified":"2013-05-20T22:10:53","modified_gmt":"2013-05-21T04:10:53","slug":"phase-ii-week-22","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=826","title":{"rendered":"Phase II &#8211; Week 22"},"content":{"rendered":"<p>Week 22 brings significant changes outside, especially to the front of the house.  The existing walkway and stairs have been removed, which means we&#8217;re using the back door until the new concrete is poured:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-002.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-002-225x300.jpg\" alt=\"Construction 2013-05-18 002\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-827\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-002-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-002-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>The basketball court is also being prepared for new concrete after additional earth is removed to bring the elevation down to be even with the side door:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-017.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-017-300x225.jpg\" alt=\"Construction 2013-05-18 017\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-828\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-017-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-017-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Inside, the new kitchen hood has been hung and vented:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-028.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-028-300x225.jpg\" alt=\"Construction 2013-05-18 028\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-829\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-028-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-028-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-031.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-031-300x225.jpg\" alt=\"Construction 2013-05-18 031\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-830\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-031-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-031-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Wall tile has been finished in the laundry rooms on second and third floors:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-066.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-066-300x225.jpg\" alt=\"Construction 2013-05-18 066\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-831\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-066-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-066-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-082.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-082-300x225.jpg\" alt=\"Construction 2013-05-18 082\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-832\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-082-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-082-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Up on third, the windows have started to be trimmed out, with the solid-surface stools being fitted:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-076.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-076-225x300.jpg\" alt=\"Construction 2013-05-18 076\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-833\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-076-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-076-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>Also on third, the bathroom fixtures have arrived and are being installed:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-079.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-079-300x225.jpg\" alt=\"Construction 2013-05-18 079\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-834\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-079-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-079-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-080.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-080-225x300.jpg\" alt=\"Construction 2013-05-18 080\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-835\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-080-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-080-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-081.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-081-225x300.jpg\" alt=\"Construction 2013-05-18 081\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-836\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-081-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-081-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>On the rear of the house, a couple windows had been held back from being installed to move materials in and out, but those are now finished:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-085.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-085-300x225.jpg\" alt=\"Construction 2013-05-18 085\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-837\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-085-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/05\/Construction-2013-05-18-085-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Week 22 brings significant changes outside, especially to the front of the house. The existing walkway and stairs have been removed, which means we&#8217;re using the back door until the new concrete is poured: The basketball court is also being &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=826\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 22<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1210,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/826"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=826"}],"version-history":[{"count":1,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/826\/revisions"}],"predecessor-version":[{"id":838,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/826\/revisions\/838"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1210"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}