{"id":938,"date":"2013-06-30T22:03:02","date_gmt":"2013-07-01T04:03:02","guid":{"rendered":"http:\/\/www.1515r.org\/?p=938"},"modified":"2013-06-30T22:03:02","modified_gmt":"2013-07-01T04:03:02","slug":"phase-ii-week-28","status":"publish","type":"post","link":"https:\/\/archive.1515r.org\/?p=938","title":{"rendered":"Phase II &#8211; Week 28"},"content":{"rendered":"<p>A lot of concrete has been poured outside, but there&#8217;s still quite a bit more to go.  The new basketball court is in, and the stairs have been formed up.  After that they&#8217;ll move on to the rear sidewalks and then the back lot:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-005.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-005-300x225.jpg\" alt=\"Construction 2013-06-30 005\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-939\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-005-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-005-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-008.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-008-300x225.jpg\" alt=\"Construction 2013-06-30 008\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-940\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-008-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-008-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The basketball hoop has been replaced thanks to some personal attention from brother Drew Stange, and the hoop is now at 3\/4&#8243; over regulation 10 feet.  Hope you guys can jump:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-011.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-011-225x300.jpg\" alt=\"Construction 2013-06-30 011\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-941\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-011-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-011-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>The new fire escape doors are in, and the steel is all being painted a color that will hopefully help it disappear into the brickwork:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-013.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-013-225x300.jpg\" alt=\"Construction 2013-06-30 013\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-942\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-013-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-013-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>Around front, the first of the new downspouts are in and they really make the front look sharper than the tired old ones:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-016.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-016-225x300.jpg\" alt=\"Construction 2013-06-30 016\" width=\"225\" height=\"300\" class=\"aligncenter size-medium wp-image-943\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-016-225x300.jpg 225w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-016-768x1024.jpg 768w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><\/a><\/p>\n<p>The tile crew from Cornhusker Tile &#038; Marble has been kept very busy, and they&#8217;re putting in the extra hours necessary to get it done.  Once the kitchen is done, they can move on to the two remaining bathrooms:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-017.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-017-300x225.jpg\" alt=\"Construction 2013-06-30 017\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-944\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-017-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-017-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-019.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-019-300x225.jpg\" alt=\"Construction 2013-06-30 019\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-945\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-019-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-019-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The epoxy floors are finished throughout the building &#8211; tough to get a good picture of, but well worth the investment:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-020.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-020-300x225.jpg\" alt=\"Construction 2013-06-30 020\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-946\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-020-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-020-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Cabinets for the new kitchenette area have arrived, which means they&#8217;ll be installed shortly:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-021.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-021-300x225.jpg\" alt=\"Construction 2013-06-30 021\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-947\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-021-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-021-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-024.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-024-300x225.jpg\" alt=\"Construction 2013-06-30 024\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-948\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-024-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-024-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>There&#8217;s a large pile of doors in the living room, which means they&#8217;re being installed on third and second floors:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-025.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-025-300x225.jpg\" alt=\"Construction 2013-06-30 025\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-949\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-025-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-025-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-043.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-043-300x225.jpg\" alt=\"Construction 2013-06-30 043\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-950\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-043-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-043-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>The new life safety systems are also going in, another sign that the project is getting close to finished:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-035.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-035-300x225.jpg\" alt=\"Construction 2013-06-30 035\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-951\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-035-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-035-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Finally, we should be getting some of the air conditioning turned on this coming week, as all of the air conditioners are piped and wired:<\/p>\n<p><a href=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-038.jpg\"><img loading=\"lazy\" src=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-038-300x225.jpg\" alt=\"Construction 2013-06-30 038\" width=\"300\" height=\"225\" class=\"aligncenter size-medium wp-image-952\" srcset=\"https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-038-300x225.jpg 300w, https:\/\/archive.1515r.org\/wp-content\/uploads\/2013\/06\/Construction-2013-06-30-038-1024x768.jpg 1024w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A lot of concrete has been poured outside, but there&#8217;s still quite a bit more to go. The new basketball court is in, and the stairs have been formed up. After that they&#8217;ll move on to the rear sidewalks and &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"more-link\" href=\"https:\/\/archive.1515r.org\/?p=938\"> <span class=\"screen-reader-text\">Phase II &#8211; Week 28<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3,4],"tags":[],"_links":{"self":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/938"}],"collection":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=938"}],"version-history":[{"count":1,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/938\/revisions"}],"predecessor-version":[{"id":953,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/posts\/938\/revisions\/953"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=\/wp\/v2\/media\/1188"}],"wp:attachment":[{"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/archive.1515r.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}