Phase II – Week 9

Phase II – Week 9

Big news for week nine is the installation of new windows. Almost all of the windows are installed, except for the windows facing the basketball court and those used for construction access:

Construction 2013-02-18 011

Construction 2013-02-18 016

With windows in, the next delivery was door frames, which will be going in as the walls are being framed:

Construction 2013-02-18 008

Construction 2013-02-18 067

Down in Erv’s apartment, the ceilings have been dropped and the bathroom has been gutted:

Construction 2013-02-18 038

Construction 2013-02-18 041

Up on second floor, framing is getting started:

Construction 2013-02-18 065

Construction 2013-02-18 070

And up on third floor, framing is done and they’re moving on to electrical and HVAC rough-ins:

Construction 2013-02-18 079

Construction 2013-02-18 081