Phase II – Week 28

Phase II – Week 28

A lot of concrete has been poured outside, but there’s still quite a bit more to go. The new basketball court is in, and the stairs have been formed up. After that they’ll move on to the rear sidewalks and then the back lot:

Construction 2013-06-30 005

Construction 2013-06-30 008

The basketball hoop has been replaced thanks to some personal attention from brother Drew Stange, and the hoop is now at 3/4″ over regulation 10 feet. Hope you guys can jump:

Construction 2013-06-30 011

The new fire escape doors are in, and the steel is all being painted a color that will hopefully help it disappear into the brickwork:

Construction 2013-06-30 013

Around front, the first of the new downspouts are in and they really make the front look sharper than the tired old ones:

Construction 2013-06-30 016

The tile crew from Cornhusker Tile & Marble has been kept very busy, and they’re putting in the extra hours necessary to get it done. Once the kitchen is done, they can move on to the two remaining bathrooms:

Construction 2013-06-30 017

Construction 2013-06-30 019

The epoxy floors are finished throughout the building – tough to get a good picture of, but well worth the investment:

Construction 2013-06-30 020

Cabinets for the new kitchenette area have arrived, which means they’ll be installed shortly:

Construction 2013-06-30 021

Construction 2013-06-30 024

There’s a large pile of doors in the living room, which means they’re being installed on third and second floors:

Construction 2013-06-30 025

Construction 2013-06-30 043

The new life safety systems are also going in, another sign that the project is getting close to finished:

Construction 2013-06-30 035

Finally, we should be getting some of the air conditioning turned on this coming week, as all of the air conditioners are piped and wired:

Construction 2013-06-30 038