Phase II – Week 3

Phase II – Week 3

Week three begins with installation of electrical conduit in the back lot to provide new electrical service:

Construction 2013-01-05 003

The old boiler system is also in process of begin removed, with liberal use of the cutting torch to create manageable pieces:

Construction 2013-01-05 010

Construction 2013-01-05 011

Inside, all the fixtures from the kitchen have been removed and stored temporarily in the dining room:

Construction 2013-01-05 019

Construction 2013-01-05 028

Construction 2013-01-05 023

In the pledge wing, removal of the asbestos ceiling material continues:

Construction 2013-01-05 062

And in the old wing, stripping of rooms continues, with third floor ahead of second floor:

Construction 2013-01-05 072

Construction 2013-01-05 081

Construction 2013-01-05 084