Phase II – Week 2

Phase II – Week 2

As week two begins, radiator removal is well under way.  I’m just glad I don’t have to move those at all:

Construction 2012-12-30 025

In the basement, ceiling removal is beginning:

Construction 2012-12-30 047

Construction 2012-12-30 046

The chapter room has been demoed and looks shockingly different:

Construction 2012-12-30 058

Removal of the paneling on the west wall reveals a beautiful painted Beta crest, peeling but still hanging on:

Construction 2012-12-30 063

In the pledge wing, the rooms have begun being stripped, with asbestos abatement for floor tile also taking place:

Construction 2012-12-30 086

Construction 2012-12-30 112

Over in the old wing, rooms are continuing to be stripped of all surfaces, with asbestos abatement for floor tile as well:

Construction 2012-12-30 157

Construction 2012-12-30 165

Construction 2012-12-30 171

 