Phase II – Week 2

As week two begins, radiator removal is well under way. I’m just glad I don’t have to move those at all:
In the basement, ceiling removal is beginning:
The chapter room has been demoed and looks shockingly different:
Removal of the paneling on the west wall reveals a beautiful painted Beta crest, peeling but still hanging on:
In the pledge wing, the rooms have begun being stripped, with asbestos abatement for floor tile also taking place:
Over in the old wing, rooms are continuing to be stripped of all surfaces, with asbestos abatement for floor tile as well: