Week two brings big progress on the foundation work. The existing columns have been removed and rebar has been delivered for forming up the new foundation walls:

IMG_0190

IMG_0192

The helical supports have been driven and are supporting the existing foundation while the new lower walls are formed and poured:

IMG_0194

IMG_0195

New footings and supporting steel columns have been installed, replacing the concrete pillars removed:

IMG_0197

IMG_0198

From the inside it’s clearer what’s going on with the foundation – it’s suspended in mid-air on the steel helical columns driven into the ground:

IMG_0199

IMG_0200

On the roof, the racking system for the air conditioners has been installed, and the roof should be going down soon:

IMG_0206

IMG_0209