Phase II – Week 13

Phase II – Week 13

In week 13 of construction, the framers have moved down to the first floor and basement. In the kitchen, the new serving counter has been framed up, and walls are being furred out:

Construction 2013-03-16 006

Construction 2013-03-16 018

In the pledge wing, the rooms are finished being split into separate sleeping and living areas:

Construction 2013-03-16 033

Construction 2013-03-16 035

Up on second and third floors of the original structure, the mechanical contractors are installing new ductwork and water supply piping:

Construction 2013-03-16 043

Construction 2013-03-16 044

In the basement the framers are starting to fur out walls for the new spaces:

Construction 2013-03-16 055

Construction 2013-03-16 056

Out back, rebar is being prepped for the new fire stair footings as well as the new concrete retaining wall:

Construction 2013-03-16 076

Construction 2013-03-16 082