Week 15 brings big changes in the basement. In the old portion of the house, ductwork and framing are starting to define the spaces:

Construction 2013-03-331 061

Construction 2013-03-331 063

In the newly excavated crawl space, the walls are up, showing how large these 4-man suites will be:

Construction 2013-03-331 069

Additionally, new structural steel to support the turnaround in the chapter room has been installed:

Construction 2013-03-331 073

Throughout the house, fire sprinkler heads are continuing to pop up. In the main floor spaces, the sprinklers are being carefully fitted from above so as not to disturb the historic finishes:

Construction 2013-03-331 016

Construction 2013-03-331 027

The insulation crew has also been busy, as all of the exterior walls have been spray-foamed for an air-tight and energy-efficient seal:

Construction 2013-03-331 030

Construction 2013-03-331 051

One inspection down means we’re that much closer to starting drywall work and beginning the finishes: