Phase II – Week 30

Phase II – Week 30

Week 30 finally brings a moment a lot of people have been waiting for – the gravel is gone, we have a paved back parking lot:

Construction 2013-07-14 017

Construction 2013-07-14 002

Our new door access controls are going in, which will be much improved over the old code system:

Construction 2013-07-14 004

In the kitchen, the cabinetry for the kitchenette is installed:

Construction 2013-07-14 021

And the first of the stainless steel is going in, the surround for the new serving opening:

Construction 2013-07-14 022

In the house director suite, the cabinetry is installed:

Construction 2013-07-14 030

While the main staircase is getting carpet, the other stairs have been getting new vinyl treads installed:

Construction 2013-07-14 031

Finally, another major milestone was installation of the special Won-Door fire door to seal off second floor from the main staircase:

Construction 2013-07-14 044