Phase II – Week 6

Phase II – Week 6

Week six starts with the addition of a nice Cheever sign in the front yard – we’re proud of the work Cheever is doing on our beautiful chapter house, and hopefully all alumni are too:

Construction 2013-01-26 005

In the kitchen, the dividing walls between the pantry, storage, and kitchenette areas have come down to make room for the new expanded kitchen:

Construction 2013-01-26 010

Construction 2013-01-26 008

Construction 2013-01-26 013

The first floor men’s restroom has also been gutted:

Construction 2013-01-26 019

In the basement, the wall separating the back stairs and the hallway has come down.  You can see the new opening into the former boiler room on the left, and the opening into the former crawl space on the right:

Construction 2013-01-26 044

In the pledge wing, removal of the non-asbestos ceilings in the individual rooms is under way:

Construction 2013-01-26 078

Construction 2013-01-26 079

In the old wing of the house, gutting of second floor is still well underway, though behind third floor:

Construction 2013-01-26 061

Construction 2013-01-26 087

Third floor is almost finished being cleared, with only remnants of the third floor bathroom and open air remaining:

Construction 2013-01-26 096

Construction 2013-01-26 097

Construction 2013-01-26 105