Phase II – Week 7

Phase II – Week 7

The arrival of large gas heaters on first floor signals the progress for week seven.  The heaters are needed for the Gyp-crete pour needed on second and third floor of the old wing to bring the floors up to level:

Construction 2013-02-02 001

Demolition is almost finished on second floor, with the layout looking much more open these days:

Construction 2013-02-02 005

Construction 2013-02-02 006

Construction 2013-02-02 012

Brothers Tom Salistean ’06 and  Kenton M. Moore ’06 take one last shower on second floor:

Construction 2013-02-02 007

On third floor, demolition is complete, which included erection of a temporary supporting wall once the hallway walls were removed.  The only walls remaining will stay in the new layout.  As mentioned, Gyp-crete was poured to bring the differing floor heights all up to the same level, and is currently curing with the help of the heaters:

Construction 2013-02-02 021

Construction 2013-02-02 022

Construction 2013-02-02 023

Construction 2013-02-02 024

Construction 2013-02-02 025