Phase II – Week 24

Phase II – Week 24

It’s been pretty rainy here in Lincoln during week 24, so there won’t be a lot of progress outside. So let’s start this first picture with a quiz: what’s missing (besides the front steps)?

Construction 2013-06-03 064

If you noticed the ugly black railing from the flat roof was gone, you’re correct! It’s thankfully down and headed for the scrap yard where it belongs:

Construction 2013-06-03 031

Around back, the masons have been patching up the remaining holes in the exterior:

Construction 2013-06-03 003

In the kitchen, the walk-in cooler and freezer have been installed:

Construction 2013-06-03 013

Construction 2013-06-03 014

Over in the formal living room, the ceiling detail is being recreated where we had to drop the ceiling for plumbing and mechanicals:

Construction 2013-06-03 016

Down in the basement, the ceilings have finally been drywalled:

Construction 2013-06-03 050

The pledge wing shower got its new curb and waterproofing installed, and is being readied for tile:

Construction 2013-06-03 043

Up on third floor, the technicians have started terminating the cable TV and network jacks:

Construction 2013-06-03 029

And up on the flat roof, the final connections are being made for the new air conditioners:

Construction 2013-06-03 037

Construction 2013-06-03 039