Phase II – Week 34
Week 34 is here, and we’re really getting down to the details before move-in. This last week was a lot of punchlist items. First up, the back lot is striped so you’ll know exactly how much your neighbor is infringing …
Week 34 is here, and we’re really getting down to the details before move-in. This last week was a lot of punchlist items. First up, the back lot is striped so you’ll know exactly how much your neighbor is infringing …
With construction winding down we need to start landscaping, which means the storage containers that have been in our front yard since December have got to go. We’re finished enough inside to have three staging areas which we’ve loaded to …
We’re really winding down construction here in the final weeks, but that means there’s a lot of finish details all coming together at the same time. First up is our new LED light for the flagpole. I haven’t seen it …
We’re coming down to the final weeks of our renovation, and there’s a lot of details coming together. One curveball was courtesy of Black Hills Energy, who installed a new gas line and moved our meter outside as part of …
A special thanks to brother Drew Stange for taking care of the construction update pictures while I was out of town. Week 31 brings a lot of finished lighting as the electricians wrap up, starting with new outdoor fixtures by …
Week 30 finally brings a moment a lot of people have been waiting for – the gravel is gone, we have a paved back parking lot: Our new door access controls are going in, which will be much improved over …
Week 29 starts off with progress on the last major concrete pour – the backlot. It’ll sure be nice not to be parking on gravel anymore. Prep is underway and forming should start right away this week: The sidewalk and …
A lot of concrete has been poured outside, but there’s still quite a bit more to go. The new basketball court is in, and the stairs have been formed up. After that they’ll move on to the rear sidewalks and …